Development Construction and Turn Keys
We believe that every little corner of the project is known by its designer, so it's the best to choose the design team as the constructors of your project. ATCO Studio offers construction services as well. The principal contractor, whether it be our choice or yours, will be liaising with ATCO Studio architects to make your construction a smooth process, fully encompassing your requirements.
Development Construction and Turn Keys
68 Mountnod Road
This project was part of a deep refurbishment of the third floor three-bedroom flat of an old Victorian house. The refurbishment consists of internal alterations and erection of a loft dormer.
Loft structure with Timber Frame in the first level of refurbishment.
Development Construction and Turn Keys
9 Lexham Gardens Mews
Excavation in underpinning Construction Process of a smart passive house in Royal Borough of Kensington and Chelsea of London
Development Construction and Turn Keys
9 Lexham Gardens Mews
they wanted to replace the garage with a smart passive house that looked like a garage. We designed this smart house with consideration to every little detail.
Refurbishment
-
1st fix material and labour
-
2nd fix labour
-
Electrical rewiring
-
Plumbing
-
Flooring
-
Plasterboards
-
Painting
-
Redecoration
£1000/sqm
Loft Conversion
-
1st fix material and labour
-
2nd fix labour
-
Floor joists
-
Roof structure
-
Insulation
-
Roof tiles
-
Flooring
-
Windows
£1400/sqm
Rear Extension
-
Foundation
-
1st fix material and labour
-
2nd fix labour
-
Walls
-
Kitchen
-
Windows
-
Flooring
£1800/sqm